Oil Spill Prevention, Control and Countermeasure Rule

The existence of the Environmental Protection Agency’s (EPA) Oil Spill Prevention, Control and Countermeasure (SPCC) Rule, which has been in place since the 1970s, is widely known in the oil and gas industry. However, it is important to be aware of changes and clarifications made in 2010 which are of particular interest to those in the oil and gas industry. In a continued effort to prevent oil discharges from reaching navigable waters and adjoining shorelines, the EPA made several clarifications and changes to the decades-old SPCC Rule. The following provides an overview of the basics of the SPCC Rule while highlighting important modifications.

Some measures adopted during the changes to the SPCC Rule are minor, and others major. The rule specifies actions required for the prevention of, preparedness for and response to oil discharges. All plans prepared before November 13, 2009, should be fully evaluated to ensure compliance. Plans should be reviewed each time conditions change at your facility. The following are some of the most important points of the amended rule.

What is its Scope?

A facility is covered by the SPCC rule if it has a total aboveground oil storage capacity greater than 1,320 gallons of oil or oil products, such as gasoline or diesel fuel. This threshold refers to the cumulative storage capacity of the facility, counting only containers larger than 55 gallons. Almost all oil production facilities, and most gas production facilities, trigger these requirements.

What Qualifies as a Facility?

You, as the operator, can determine the boundaries of your facility under the rule’s guidelines. The rule allows that “contiguous or non-contiguous buildings, properties, parcels, leases, structures, installations, pipes or pipelines under the ownership or operation of the same person” be considered separate facilities. With careful consideration, you are able to define boundaries so as to minimize the effect of the rule on operations.

What is Navigable Water?

Previously, almost all oil and gas facilities over the minimum thresholds were thought to have the potential to affect navigable water since the definition of “navigable waters” was interpreted broadly. New criteria, established under EPA guidance, describe a narrower definition of navigable water:

  • Traditionally Navigable Waters (TNW) and any adjacent wetlands—even if they do not directly connect to the TNW
  • Relatively Permanent Waters (RPW) and any wetlands that “directly about” the RPW—which is not the same as “adjacent”
  • Other isolated and/or non-RPW waters or wetlands that have a “significant nexus” to a TNW

The criteria under the guidance, although still somewhat ambiguous, significantly reduced the number of locations that would impact navigable waters in the event of an oil spill. Thus, it also reduced the number of oil and gas facilities in the United States that would require SPCC plans. Use competent personnel to analyze each of your locations and document its potential to impact navigable waters and, its need for an SPCC plan.

Exemptions to the Rule

Permanently closed containers, motive power containers and completely buried storage tanks—already subject to storage tank regulations—are exempt in the modified rule. Intra-facility gathering lines that are subject to the U.S. Department of Transportation’s (DOT) pipeline regulations are also exempt.

Loading “Racks” vs “Areas”

The original SPCC regulation covered “loading areas” for oil transfer, generating confusion regarding transfer operations at typical oilfield tank batteries. The term “loading area” has been replaced with “loading rack,” defining it in a way that excludes most oilfield truck transfer facilities. However, if an oil production facility does trigger the loading rack criteria, the rule is clear about enforcement. Operators should evaluate their plans and facilities to ensure that the latest guidance is used.

Water Containers

Exemptions from the tank inspection and secondary containment requirements exist for certain produced water containers if a professional engineer certifies the procedures used to minimize oil accumulation in the container.

Fines

Fines for non-compliance with the SPCC regulations are normally assessed in proportion to the size of the facility. Fines administered by EPA for SPCC violations related to the Clean Water Act ranged from $500 to $200,000.

Managing Risk

Even with a compliant SPCC Plan, there is substantial risk in the oil and gas industry that must be revisited on a regular basis for accuracy and completeness. Contact the insurance professionals at INSURICA to be sure you are sufficiently managing your risk.

This Risk Insights is not intended to be exhaustive nor should any discussion or opinions be construed as legal advice. Readers should contact legal counsel or an insurance professional for appropriate advice. © 2010 Zywave, Inc. All rights reserved.

About the Author

INSURICA
INSURICA

Share This Story

Stay Updated

Subscribe to the INSURICA blog and receive the latest news direct to your inbox.

Subscribe to the blog

Related Blogs

Preparing for Freezes: Protecting Your School During Cold Weather

January 17th, 2025|Blog, Education, News|

Preventing Frozen Pipes in Schools is essential to maintaining a safe and operational learning environment during cold weather. Frozen and burst pipes can cause costly damage, disrupt daily activities, and compromise the safety of students and staff. By taking proactive steps, schools can effectively mitigate these risks and ensure their facilities are prepared for freezing temperatures.

Cyber Case Study: Hack at Steel Mill Causes Physical Damage

January 16th, 2025|Blog, Risk Management, Trending|

 In late 2014, the German Federal Office for Information Security (BSI) released a report detailing a disruptive cyber attack at an unnamed steel mill facility. The attack—which was deployed through a combination of social engineering tactics and malware— compromised several of the steel mill’s industrial control components. From there, equipment breakdowns and production outages ensued, resulting in extensive property destruction.

Go to Top